Trainel Borkum West II (Adwen) 2012-2015

  • Cable Layout dimensioning
  • Grid Code Analysis of TenneT TSO
  • Modelling of the electrical drive train of the WTG in DigSILENT Power Factory, MATLAB / Simulink – SimPowerSystems
  • Monitoring and Assessment of LVRT measurements on AD5-116 Prototype
  • Monitoring of the certification process – unit and plant certificate