In order to ensure system security and integration of renewable electricity sources, the requirements apply up to the level of generating modules (Generating Units) and the corresponding components.
Our experts are continually aligned with the TSO’s, DNO’s and certification bodies ensuring state-of the art specifications based on worldwide actual valid requirements for renewable power plants and generating units.
-
- Requirements for Power Plants: analysis and interpretations aligned and agreed directly with the TSO of on- and off-shore applications in the European, American and Asian markets.
- Requirements for Generating Units: analysis and interpretations aligned and agreed directly with the TSO or DNO of on- and off-shore applications in the European, American and Asian markets.
- Specifications for Power Plants: measurements-, modelling- and simulation plans and definitions, based on project dedicated standards
- Specifications for Generating Units: measurement-, modelling- and simulation plans and definitions, based on project dedicated standards
- Other Requirements/Specifications: dedicated to the compliance of prototype activities, project specific solutions, considering the optimal integration of the generating unit within the power plant connected to the grid
Main Grid Connection regulations, standards and grid codes:
No. REFERENCE NAME [1] GL2012-OFS Guideline for the certification of offshore Wind Turbines, GL Ed2012 [2] VDN German Transmission Code 2007 [3] BDEW Guideline for plants connected to the medium-voltage network, Ed. June 2008 [4] SDLWindV Ordinance on System Services by Wind Energy Plants [5] FGW, Part 3 Measurements of Electrical Properties – Power Quality (EMC), Revision 23, dated 01.05.2013 [6] FGW, Part 4 Modelling and Validating Simulation Models of the Electrical Characteristics of Power Generating Units and Systems, Revision 6, dated 07.04.2014 [7] FGW, Part 8 Certification of the Electrical Characteristics of Power Generating Units and Systems in the Medium-, High- and Highest-voltage Grids, Revision 6, dated 01.05.2013 [8] TenneT TSO Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH, dated: 21-12-2012 [9] 50Hertz TSO NETZANSCLUSS UND NETZANSCLUSSREGELN, Technisch organisatorische Mindestanforderungen, Stand Mai 2008 [10] NGET National Grid Electricity Transmission, THE GRID CODE – ISSUE 5 – Revision 4, 19 August 2013 [11] RTE Réseau de transport d’électricité, Documentation technique de référence [12] ENTSOE Commission Regulation (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for grid connection generators. [13] Danish Technical regulation 3.2.5 for wind power plants with a power output above 11 kW. Published UK edition, approved 10.06.2015 [14] Dutch Tennet, Compliance activities in relation to Connection Requirements Wind Farms System Operations – Version V3.0 January 2014